    2.   Paragraph 1 shall not apply to data centres used for, or providing their services exclusively with the final aim of, defence and civil protection.
    3.   The Commission shall establish a European database on data centres that includes information communicated by the obligated data centres in accordance with paragraph 1. The European database shall be publicly available on an aggregated level.
    4.   Member States shall encourage owners and operators of data centres in their territory with a power demand of the installed IT equal to or greater than 1 MW to take into account the best practices referred to in the most recent version of the European Code of Conduct on Data Centre Energy Efficiency.
    5.   By 15 May 2025, the Commission shall assess the available data on the energy efficiency of data centres submitted to it pursuant to paragraphs 1 and 3 and shall submit a report to the European Parliament and to the Council, accompanied, where appropriate, by legislative proposals containing further measures to improve energy efficiency, including establishing minimum performance standards and an assessment on the feasibility of transition towards a net-zero emission data centres sector, in close consultation with the relevant stakeholders. Such proposals may establish a timeframe within which existing data centres are to be required to meet minimum performance.

    Article 13

    Metering for natural gas

    1.   Member States shall ensure that, in so far as technically possible, financially reasonable, and proportionate to the potential energy savings, natural gas final customers are provided with competitively priced individual meters that accurately reflect the final customer’s actual energy consumption and that provide information on actual time of use.
    Such a competitively priced individual meter shall always be provided when:
    (a) an existing meter is replaced, unless this is technically impossible or not cost-effective in relation to the estimated potential savings in the long term;
    (b) a new connection is made in a new building or a building undergoes major renovations within the meaning of Directive 2010/31/EU.
    2.   Where, and to the extent that, Member States implement smart metering systems and roll out smart meters for natural gas in accordance with Directive 2009/73/EC:
    (a) they shall ensure that the metering systems provide to final customers information on actual time of use and that the objectives of energy efficiency and benefits for final customers are fully taken into account when establishing the minimum functionalities of the meters and the obligations imposed on market participants;
    (b) they shall ensure the security of the smart meters and data communication, and the privacy of final customers, in compliance with relevant Union data protection and privacy law;
    (c) they shall require that appropriate advice and information be given to customers at the time of installation of smart meters, in particular about their full potential with regard to meter reading management and the monitoring of energy consumption.

    Article 14

    Metering for heating, cooling and domestic hot water

    1.   Member States shall ensure that, for district heating, district cooling and domestic hot water, final customers are provided with competitively priced meters that accurately reflect their actual energy consumption.
    2.   Where heating, cooling or domestic hot water is supplied to a building from a central source that services multiple buildings or from a district heating or district cooling system, a meter shall be installed at the heat exchanger or point of delivery.
    Markierungen
    Leseansicht
    Verwendung von Cookies.

    Durch die Nutzung dieser Website akzeptieren Sie automatisch, dass wir Cookies verwenden. Cookie-Richtlinie

    Akzeptieren