Regulation (EU) 2026/1184 of the European Parliament and of the Council of 20 May... (32026R1184)
Regulation (EU) 2026/1184 of the European Parliament and of the Council of 20 May... (32026R1184)
REGULATION (EU) 2026/1184 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
of 20 May 2026
on the use of railway infrastructure capacity in the single European railway area, amending Directive 2012/34/EU and repealing Regulation (EU) No 913/2010
(Text with EEA relevance)
CHAPTER I
General provisions
Article 1
Subject matter and scope
Article 2
General responsibilities and principles
Article 3
Impartiality of the infrastructure manager in respect of capacity and traffic management, including maintenance planning
Article 4
Strategic guidance and national requirements
Article 5
Definitions
CHAPTER II
Management of railway infrastructure capacity
Section 1
General principles for the management of railway infrastructure capacity
Article 6
Capacity management
Article 7
European framework for capacity management
Article 8
Applicants
Article 9
Management of railway infrastructure capacity
Article 10
Information about railway infrastructure capacity
Article 11
Capacity restrictions resulting from railway infrastructure work and degraded railway infrastructure
Article 12
Refusal or withdrawal of capacity rights on public order or public security grounds
Section 2
Strategic capacity planning
Article 13
Strategic capacity planning
Article 14
General requirements for strategic capacity planning
Article 15
Consultation with stakeholders on strategic capacity planning
Article 16
Coordination on strategic capacity planning between infrastructure managers
Article 17
Analysis of expected transport market developments
Article 18
Capacity strategy
Article 19
Capacity model
Article 20
Capacity supply plan
Article 21
Contingency planning
Article 22
Criteria and procedures for the allocation of pre-planned capacity and for the definition of capacity planning objects
Article 23
Highly utilised and congested railway infrastructure
Article 24
Capacity analysis in case of highly utilised or congested railway infrastructure
Article 25
Capacity-enhancement plan
Article 26
Specialised railway infrastructure
Article 27
Capacity partitioning of railway infrastructure declared as being highly utilised or congested
Section 3
Scheduling and capacity allocation
Article 28
Capacity rights
Article 29
Methods of capacity allocation
Article 30
Allocation and coordination of multi-network capacity rights
Article 31
Cooperation in the allocation of railway infrastructure capacity and capacity in service facilities
Article 32
Working timetable
Article 33
Capacity allocation through framework agreements
Article 34
Capacity allocation through the annual allocation process
Article 35
Capacity allocation through the rolling planning process
Article 36
Capacity allocation through the ad hoc process
Article 37
Scheduling of capacity restrictions resulting from railway infrastructure works
Article 38
Consensual conflict resolution mechanism and coordination of requests
Article 39
Formal conflict resolution mechanism
Article 40
Schedule for capacity allocation processes
Section 4
Adaptation and rescheduling
Article 41
Changes to capacity rights after allocation
Article 42
Penalty for changes to capacity rights
Article 43
Rescheduling in the context of disruption management and crisis management
CHAPTER III
Traffic, disruption and crisis management
Article 44
Traffic management, disruption management and crisis management
Article 45
Rules and procedures for traffic management and disruption management
Article 46
European framework for the coordination of cross-border traffic management, disruption management and crisis management
Article 47
Coordination of cross-border traffic management, disruption management and crisis management
Article 48
Network disruption
Article 49
Crisis situations
Article 50
Exchange of information on traffic management
CHAPTER IV
Performance review
Article 51
General principles for performance review
Article 52
European framework for performance review
Article 53
European performance review report
Article 54
Advisory Performance Panel
CHAPTER V
European network for coordination
Article 55
Coordination among infrastructure managers
Article 56
Coordination among Member States
Article 57
Consultation mechanism for European and cross-border matters
Article 58
Organisation of ENIM
Article 59
Responsibilities of ENIM
Article 60
Transparency of ENIM
Article 61
Network coordinator
Article 62
Tasks of the network coordinator
Article 63
Organisation of the ERP
Article 64
Focal points for coordination of infrastructure managers
Article 65
Common structure, contents and schedule for network statements
Article 66
Digitalisation of capacity and traffic management
CHAPTER VI
Regulatory oversight of capacity and traffic management
Section 1
Regulatory bodies
Article 67
Responsibilities of regulatory bodies
Section 2
European Network of Rail Regulatory Bodies
Article 68
Cooperation of regulatory bodies within the ENRRB
Article 69
Organisation and structure of the ENRRB
Article 70
Tasks and responsibilities of the ENRRB
Article 71
Composition and organisation of the Board
Article 72
Role and tasks of the Board
CHAPTER VII
Final provisions
Article 73
Monitoring of European frameworks
Article 74
Implementing acts relating to the monitoring of the European frameworks
Article 75
Exercise of the delegation
Article 76
Committee procedure
Article 77
Report and review
Article 78
Amendments to Directive 2012/34/EU
Article 79
Transitional provisions
Article 80
Repeal
Article 81
Entry into force and application
ANNEX I
DELIVERABLES AND SCHEDULE FOR CAPACITY MANAGEMENT
Section 1
Deliverables to be prepared by infrastructure managers in strategic capacity planning referred to in Articles 13, 18, 19 and 20
|
Deliverable |
Contents |
||||||||||||||||||||||||||
|
Capacity strategy (Article 18) |
|
||||||||||||||||||||||||||
|
Capacity model (Article 19) |
|
||||||||||||||||||||||||||
|
Capacity supply plan (Article 20) |
|
Section 2
Schedule for strategic capacity management referred to in Articles 13, 18, 19 and 20
|
Deliverable |
Milestone |
Deadline (at latest) |
|
Capacity strategy (Article 18) |
Start of the capacity strategy elaboration phase |
X–60 |
|
First consultation with operational stakeholders |
X–58 |
|
|
Publication of the draft strategy and second consultation with operational stakeholders on the draft strategy |
X–39 |
|
|
Publication of final capacity strategy following final coordination between infrastructure managers and taking into account any comments that the ERP might have issued following the publication of the draft capacity strategy |
X–36 |
|
|
Capacity model (Article 19) |
Start of preparation |
X–36 |
|
Capacity needs announcements by applicants and potential applicants and consultation with operational stakeholders |
X–24 |
|
|
Publication of the draft capacity model and start of the second consultation with applicants, operational stakeholders. |
X–21 |
|
|
End of consultation with applicants and operational stakeholders and taking into account any comments that the regulatory body might have issued following the publication of the draft capacity model |
X–19 |
|
|
Publication of final capacity model following final coordination between infrastructure managers |
X–18 |
|
|
Capacity supply plan (Article 20) |
Start of preparation |
X–18 |
|
Consultation with applicants and operational stakeholders |
X–14 |
|
|
Regulatory body shall analyse the draft capacity supply plan and may take a decision requiring the infrastructure manager to amend the capacity supply plan |
X–14 to X–13 |
|
|
Publication of capacity restrictions referred to in point 2 of Section 3 of this Annex |
X–12 |
|
|
Publication of final capacity supply plan following final coordination between infrastructure managers |
X–11 |
|
|
Update of capacity supply plan for late requests |
X- 6,5 |
|
|
Publication of capacity restrictions referred to in point 5 of Section 3 of this Annex |
X–4 |
|
|
|
Re-purposing of capacity reserved for allocation through the working timetable for other allocation processes |
X–2 |
|
|
Update of capacity supply plan to reflect any changes to pre-planned or allocated capacity |
Until X+12 without delay |
|
Note: ‘X–m’ means ‘m’ months before the date of entry into force of the working timetable (‘X’), in accordance with Section 4. |
||
|
Capacity strategy (Article 18) |
Publication of the draft strategy and consultation with operational stakeholders |
X–38 |
|
Publication of final capacity strategy following final coordination between infrastructure managers and taking into account any comments that the ERP might have issued following the publication of the draft capacity strategy |
X–36 |
Section 3
Schedule and requirements for coordination, consultation and publication of capacity restrictions resulting from railway infrastructure works referred to in Articles 11 and 37
|
|
Duration |
Impact on traffic |
Finalisation of first coordination and consultation and publication of draft capacity restrictions |
Finalisation of second coordination and consultation on capacity restrictions with impact on more than one network |
Publication of final capacity restrictions |
Provision of details on the alternative train paths offered |
|
Major impact |
More than 30 days |
More than 50 % |
X–24 |
X–18 |
X–12 |
|
|
High impact |
More than 7 days |
More than 30 % |
X–24 |
X–13,5 |
X–12 |
|
|
Medium impact |
7 days or less |
More than 50 % |
|
X–13,5 |
X–12 |
|
|
Low impact |
7 days or less |
More than 10 % |
|
|
X–4 |
T–4 Passenger T–1 Freight |
|
‘X–m’ means ‘m’ months before the date of entry into force of the working timetable (‘X’) in accordance with Section 4 ‘T–m’ means ‘m’ months before the start of the train run concerned |
||||||
Section 4
Schedule for capacity allocation through the annual allocation process referred to in Articles 34 and 40
|
Milestone or time period |
Deadline or duration |
|
Period of validity of the working timetable (‘working timetable period’) |
Starting at midnight on the second Saturday of December up to midnight of the second Saturday of December of the following year. |
|
Entry into force of the working timetable |
Midnight on the second Saturday in December |
|
Publication of capacity supply plan |
In accordance with Section 2 of this Annex |
|
Publication of capacity restrictions resulting from railway infrastructure works |
In accordance with Sections 2 and 3 of this Annex |
|
Deadline for applicants to submit requests for capacity rights |
X- 9,5 |
|
Preparation of draft working timetable Deadline for infrastructure manager(s) to submit draft capacity offer to applicants |
X- 7,5 |
|
Finalisation of consultation with applicants |
X- 6,5 |
|
Deadline for infrastructure manager(s) to submit final capacity offer to applicants |
X- 5,5 |
|
Publication of working timetable Deadline for infrastructure manager to allocate capacity rights to applicants |
X- 5,25 |
|
Conversion of capacity specifications into train paths |
To be specified by the infrastructure managers in the network statement, taking into account the European framework for capacity management referred to in Article 7 |
|
Note: ‘X–m’ means ‘m’ months before the date of entry into force of the working timetable (‘X’) |
|
Section 5
Schedule for capacity allocation through framework agreements referred to in Articles 33 and 40
|
Time period |
Duration |
|
Standard period of validity of framework agreements |
5 years |
|
Conversion of capacity specifications in train paths |
Between X- 9,5 and X- 7,5 (jointly with coordination under the annual allocation process referred to in Section 4) |
|
Note: ‘X–m’ means ‘m’ months before the date of entry into force of the working timetable (‘X’) in accordance with Section 4 |
|
Section 6
Schedule for the rolling planning capacity allocation process referred to in Articles 35 and 40
|
Milestone or time period |
Deadline or duration |
|
Earliest point in time for applicants to submit capacity requests under the rolling planning capacity allocation process |
Four months before the first train run |
|
Latest point in time for applicants to submit capacity to requests under the rolling planning capacity allocation process |
One month before the first train run |
|
Maximum duration of capacity rights granted under the rolling planning capacity allocation process |
36 months starting from the first train run |
|
Conversion of capacity specifications in train paths for capacity rights granted in accordance with paragraph 2, point (a) of Article 35 |
To be specified by the infrastructure managers taking into account the European framework for capacity management referred to in Article 7 |
|
Conversion of capacity specifications in train paths for capacity rights granted in accordance with paragraph 2, point (b) of Article 35 |
To be specified by the infrastructure managers taking into account the European framework for capacity management referred to in Article 7 |
|
Maximum period for infrastructure managers to prepare an offer of capacity rights under the rolling planning capacity allocation process |
15 days |
|
Note: ‘X–m’ means ‘m’ months before the date of entry into force of the working timetable (‘X’) in accordance with Section 4 |
|
Section 7
Schedule for capacity allocation through the ad hoc process referred to in Articles 36 and 40
|
Time period |
Duration |
|
Maximum period for infrastructure managers to prepare an offer of capacity rights |
Seven calendar days and in any case 24 hours before the start of the train service |
Section 8
Schedule for changes to capacity allocated referred to in Article 41
|
Milestone or time period |
Deadline or duration |
|
Maximum time for the infrastructure manager to offer an alternative capacity right involving a single network |
Four calendar days and in any case 24 hours before the start of the train service |
|
Maximum time for infrastructure managers concerned to offer an alternative multi-network capacity right |
Eight calendar days and in any case 24 hours before the start of the train service |
ANNEX II
THRESHOLDS FOR THE DECLARATION OF HIGHLY UTILISED AND CONGESTED RAILWAY INFRASTRUCTURE REFERRED TO IN ARTICLE 23
|
Utilisation |
Classification |
Capacity utilisation |
Reference period |
|
Heterogenous traffic |
Highly utilised |
> 85 % of theoretical capacity |
More than four hours for more than 200 days per year |
|
Heterogenous traffic |
Congested |
> 95 % of theoretical capacity |
More than four hours for more than 250 days per year |
|
Homogeneous traffic |
Highly utilised |
> 90 % of theoretical capacity |
More than four hours for more than 200 days per year |
|
Homogenous traffic |
Congested |
> 95 % of theoretical capacity |
More than four hours for more than 250 days per year |
ANNEX III
CONTENTS OF THE EUROPEAN FRAMEWORK FOR CAPACITY MANAGEMENT REFERRED TO IN ARTICLE 7
|
Element |
Reference(s) |
|
Types and description of rail transport services to be used for the purposes of strategic capacity planning. |
Article 14(2) |
|
Common tools, methodologies and procedural arrangements for strategic capacity planning, including for the coordination between infrastructure managers and the consultation with stakeholders, including for the Capacity Needs Announcements. |
Article 14(4), Article 14(10), Article 15, Article 16, Article 19(1), Article 57 |
|
Guidelines setting out procedures and methodologies to be used for the transport market analysis |
Article 17(3) |
|
Means for publication of the capacity supply plan and process for consultation with applicants |
Article 20(11) |
|
Guidelines on the definition of limits within which the infrastructure manager can propose a capacity model, or a capacity supply plan, that differs from the input received |
Article 19(3), Article 20(7) |
|
Criteria and procedures for the allocation of pre-planned capacity included in the capacity supply plan. |
Article 22(4) |
|
Specifications for capacity planning objects in human-readable and in machine-readable format |
Article 22(5) |
|
Common method on the utilisation of railway infrastructure capacity |
Article 23(2) |
|
Methodology for assessment and the list of parameters relating to rail transport services and socioeconomic and environmental criteria, including the list of parameters, standard parameter values, or ranges of standard values |
Article 27(4), Article 39(4) |
|
Characteristics of capacity specifications |
Article 28(1) |
|
Ranges for threshold quotas applicable to the cancellation of unused capacity rights |
Article 29(3) |
|
Procedures and methods to coordinate the allocation of multi-network capacity rights, including minimum quality requirements. |
Article 30(5) |
|
Guidelines on the definition of the limits regarding the differences between capacity requests by applicants and railway infrastructure capacity proposed by infrastructure managers in the consensual conflict resolution process. |
Article 38(2) |
|
Guidelines for the consensual conflict resolution mechanism for conflicts including at least one multi-network capacity request |
Article 38(7) |
|
Procedures to manage changes to capacity rights after allocation. |
Article 41(10) |
|
Guidelines for the application of the modulation of penalties |
Article 42(6) |
|
Guidelines for appropriate and regular consultation with interested parties regarding European and cross-border matters |
Article 57(2) |
ANNEX IV
MINIMUM AND MAXIMUM LEVEL OF THE PENALTY, IN ACCORDANCE WITH ARTICLE 42
ANNEX V
CONTENTS OF THE NETWORK STATEMENT REFERRED TO IN ARTICLE 27 OF DIRECTIVE 2012/34/EU – SECTION ON CAPACITY MANAGEMENT AND TRAFFIC MANAGEMENT
ANNEX VI
CONTENTS OF THE EUROPEAN FRAMEWORK FOR THE COORDINATION OF CROSS-BORDER TRAFFIC MANAGEMENT, DISRUPTION MANAGEMENT AND CRISIS MANAGEMENT REFERRED TO IN ARTICLE 46
|
Element |
Reference(s) |
|
Rules and procedures for traffic management and disruption management to be taken into account by infrastructure managers when setting out rules and procedures for traffic management. |
Article 45 |
|
Common rules and procedures for the coordination of traffic management, disruption management and crisis management between infrastructure managers and with operational stakeholders. |
Article 44, Article 45, Article 46(1), Article 46(4) Article 47, Article 48 |
|
Guidelines for managing and allocating capacity in the event of network disruptions and crisis situations. |
Article 43(2) |
|
Definition of responsibilities of operational stakeholders involved in the management of cross-border traffic, based on a set of agreed operational procedures, milestones and interfaces. |
Article 47 |
|
Procedures, rules, tools and interfaces for communication and the exchange of information, including harmonised digital tools and interfaces, between infrastructure managers, operational stakeholders and other stakeholders concerned, in particular public authorities. |
Article 47, Article 50, Article 66 |
|
Principles to establish dedicated coordination groups in relation to traffic management, disruption management and crisis management. |
Article 55(2) |
|
Arrangements for simulation and training, in particular in relation to disruptions and crisis situations |
Article 49(7) |
|
Common method to estimate the conditions on duration and likely impact on traffic and the content of the incident report of the network coordinator |
Article 48(7) |
|
Guidelines with the purpose of ensuring appropriate and regular consultation with interested parties regarding European and cross-border matters |
Article 57(2) |
ANNEX VII
NETWORK DISRUPTIONS REFERRED TO IN ARTICLE 48
|
Type of incident |
Estimated likely duration |
Estimated likely impact |
||||
|
Network disruption |
The return to pre-incident levels of available capacity for train utilisation requires three or more days |
|
||||
|
Multi-network disruption |
The return to pre-incident levels of available capacity for train utilisation requires three or more days |
|
ANNEX VIII
CONTENTS OF THE EUROPEAN FRAMEWORK FOR PERFORMANCE REVIEW REFERRED TO IN ARTICLE 52
|
Performance area |
Relevant issues (indicative) |
||||||||||||
|
Railway infrastructure and equipment |
|
||||||||||||
|
Railway infrastructure capacity |
|
||||||||||||
|
Traffic management |
|
||||||||||||
|
Disruption management and crisis management |
|
||||||||||||
|
Deployment and performance of digital services, tools and interfaces |
|
||||||||||||
|
Compliance with regulation; regulatory oversight |
|
||||||||||||
|
Arrangements to review the performance of traffic management, disruptions management and crisis management, including the coordination between operational stakeholders |
|||||||||||||
|
Guidelines with the purpose of ensuring appropriate and regular consultation with interested parties regarding European and cross-border matters, as referred to in Article 57(2) |
|||||||||||||
ANNEX IX
INFORMATION TO BE PROVIDED TO OPERATIONAL STAKEHOLDERS REFERRED TO IN ARTICLE 50
ANNEX X
CORRELATION TABLES
1.
Correlation table for the provisions deleted in Directive 2012/34/EU
|
Directive 2012/34/EU |
This Regulation |
|
Article 2(6) |
Article 40(2) |
|
Article 3, point (20) |
Article 23 and Annex II |
|
Article 3, point (22) |
Articles 38 and 39 |
|
Article 3, point (23) |
Article 5, point (6) and Article 33 |
|
Article 3, point (27) |
Article 5, point (9) |
|
Article 3, point (28) |
Article 5, point 14 |
|
Article 7b(1) |
Article 3(1) |
|
Article 7b(2) |
Article 3(3) |
|
Article 7b(3) |
Article 3(4) and Article 2(4), point (b) |
|
Article 36 |
Article 42 |
|
Article 38(1) |
Article 28(1), second subparagraph and Article 28(5) |
|
Article 38(2) |
Article 28(3) |
|
Article 38(3) |
Article 28(4) |
|
Article 38(4) |
Article 28(6) |
|
Article 39(1) |
Article 13(3) |
|
Article 39(2) |
Article 3(2) |
|
Article 40(1) |
Article 16, Article 30 and Article 55 |
|
Article 40(2) |
Article 58(10), Article 61(2), Article 67(1), Article 68(1) and (7) |
|
Article 40(3) |
Article 58(3) and (8) |
|
Article 40(4) |
Article 56(1) |
|
Article 40(5) |
— |
|
Article 41(1) |
Article 8(1) |
|
Article 41(2) |
Article 8(2) |
|
Article 41(3) |
Article 8(3) |
|
Article 42(1) |
Article 33(1) |
|
Article 42(2) |
Article 33(6) |
|
Article 42(3) |
Article 33(7) |
|
Article 42(4) |
Article 33(7) |
|
Article 42(5) |
Article 33(8) and Annex I, Section 5 |
|
Article 42(6) |
Article 33(9) |
|
Article 42(7) |
Article 33(11) |
|
Article 42(8) |
Article 33(12) |
|
Article 43(1) |
Article 40(1), Article 34(5), (6), (7), Article 35(1) and (2) and Annex I, Sections 2, 4, 5, 6 and 7 |
|
Article 43(2) |
Article 11(9), Article 13(2), Article 23(9), Article 40(3), and Article 41(11) |
|
Article 43(3) |
— |
|
Article 44(1) |
Article 28(1) |
|
Article 44(2) |
Article 34(6) and (7) |
|
Article 44(3) |
Article 33(4) |
|
Article 44(4) |
Article 30 and Article 66(5) |
|
Article 45(1) |
Article 34(1) |
|
Article 45(2) |
Article 27 |
|
Article 45(3) |
Article 34(9) |
|
Article 45(4) |
Article 34(9) |
|
Article 46(1) |
Article 38(1) |
|
Article 46(2) |
Article 38(2) |
|
Article 46(3) |
Article 38(3) |
|
Article 46(4) |
Article 38(4) |
|
Article 46(5) |
Article 38(2) |
|
Article 46(6) |
Article 39 |
|
Article 47(1) |
Article 23(1) and Annex II |
|
Article 47(2) |
Article 23(5) |
|
Article 47(3) |
Article 27(1) |
|
Article 47(4) |
Article 9(1) and (2) and Article 13(3) |
|
Article 47(5) |
Article 9(1) and Article 35 |
|
Article 47(6) |
Article 23(6) |
|
Article 48(1) |
Article 36(1) |
|
Article 48(2) |
Article 20(5) |
|
Article 49(1) |
Article 26(1) |
|
Article 49(2) |
Article 26(2) |
|
Article 49(3) |
Article 26(3) |
|
Article 50(1) |
Article 24(1) |
|
Article 50(2) |
Article 24(2) |
|
Article 50(3) |
Article 24(1) |
|
Article 51(1) |
Article 23(1) |
|
Article 51(2) |
Article 25(1) and (2) |
|
Article 51(3) |
Article 25(4) |
|
Article 51(4) |
Article 25(5) |
|
Article 52(1) |
Article 14(9) |
|
Article 52(2) |
Article 29(3) |
|
Article 53(1) |
Article 37(1) |
|
Article 53(2) |
Article 11(2), (4) and Article 37(3) |
|
Article 53(3) |
Article 10(1) |
|
Article 54(1) |
Article 45(3) |
|
Article 54(2) |
Article 45(5) |
|
Article 54(3) |
Article 45(7) |
2.
Correlation table for Regulation (EU) No 913/2010
|
Regulation (EU) No 913/2010 |
This Regulation |
|
Articles 1 to 7 |
— |
|
Article 8 |
Articles 58(1) to (7), (9), (10) and (11) and Article 60(1), points (a), (b) and (c) and (g) and Article 60(2) |
|
Article 9(1) |
Article 16(1), Article 24(3) and (4), Article 25(3) and Article 61 |
|
Article 9(1), points (a), (c), (d) and (e), Article 9(2), Article 9(3), Article 9(4) and Article 9(5) |
— |
|
Article 9(1), point (b) |
Article 17 and Article 24(3) and (4) |
|
Article 10 |
— |
|
Article 11 |
Article 58(1) to (7), (9), (10) and (11) |
|
Articles 12 to 18 |
— |
|
Article 19 |
Article 51 and Article 70(7) and (8) |
|
Articles 20 to 25 |
— |